Capital Project Public Vote Unofficial Results from December 14, 2021

Proposition No. 1 District Facilities Upgrades Project up to $20,200,000 passes. Yes  172 No 65 Passed 

 Voters approve Proposition No. 1 for the reconstruction, rehabilitation and renovation of, and the construction of improvements and upgrades to, various District buildings and facilities and the sites thereof, at an estimated maximum cost of $20,200,000. 

Proposition No. 2 (Contingent) Cayuga Heights Auditorium Addition Project up to $4,700,000 passes. Yes 159 No 74 Passed

Voters approve Proposition No. 2 for the development of an auditorium addition at the Cayuga Heights Elementary School Building, along with various other measures at an estimated maximum cost of $4,700,000. 

Proposition No. 3 (Contingent) District-Wide Air Conditioning Project up to $9,800,000 passes. Yes 162 No 72 Passed

Voters approve Proposition No. 3 consisting of a prioritized District-wide air conditioning project, and various other measures at an estimated maximum cost of $9,800,000. 

 

*Note: Proposition 1 needed to pass before Proposition 2 can be considered, and Propositions 1 and 2 needed to pass before Proposition 3 can be considered.